Our Past Experience
300+ projects & 6 years later in NSW, Victoria & Western Australia
Swipe across the skyline and tap a projectMove across the skyline — the crane drives to your cursor. Click a project to lift it
Previous projects
Some of the work behind those numbers
300+
projects
6
years
3
states: NSW, Victoria and Western Australia
Bridges, roads and tunnels
West Gate Tunnel Project — Melbourne
A generational freeway–tunnel connecting Melbourne's inner city, set to slash travel times.
Road bridge beams — Bridges 1860 & 1861, Bayswater
Installed the bridge beams over live road corridors.
Grove GMK5250XL-1, 9.2 t at 34 m radius, 53.6 m boom
Pedestrian underpass — Tonkin Hwy, Bayswater
Placed precast arch panels to form the underpass, flipping each one from flat to upright on the hook, plus the wing-wall panels.
Grove GMK5250XL-1 (250 t), Panels up to ~23.6 t at 22 m radius
Highway noise walls — Leach Hwy & Welshpool Rd
Installed precast noise wall panels along the highway.
Grove GMK5250XL-1, Panels ~12.5 t
Bridge piers — Guildford Rd & Tonkin Hwy, Bayswater
Long-reach lift to set bridge pier elements.
Demag AC250-1, 11.1 t at 42 m
Footbridge pier reinforcement cage — Perth metro
Lifted the steel reinforcement cage for a footbridge pier.
Liebherr LTM1095, 2.2 t at 16 m
Towers and telecommunications
Mobile phone tower antennas — Mundaring, WA
Lifted antenna equipment to the top of a 45 m monopole in bushland.
Liebherr LTM1070-4.2, 2.9 t at 12 m radius, 43 m boom
30 m communications monopole — Iron Bridge mine, WA
Lifted and erected a complete 30 m steel monopole.
Demag AC220-5, 4.8 t at 18 m radius, 54.4 m boom
Optus telco tower lift — Ballidu, WA
Lifted a telecommunications tower into place at Ballidu.
Rail
Rail overhead wiring structures — Kwinana Freeway, Perth
Lifted overhead line structures in the freeway median, with tag lines controlling each one.
Challenger 3160, 2.9 t at 20 m
Rail extension bridge piles — Yanchep line, northern Perth
Rotated a bridge test pile reinforcement cage from flat to vertical and lowered it into place.
Liebherr HS 845 HD, 7.4 t at 14 m
Mining, power and solar
40 m steel monopole — substation, Boddington, WA
Erected a 40 m monopole inside an electrical substation.
Demag AC80-2, 5 t at 14 m radius, 46.1 m boom
Mine tunnel arch — Cloudbreak, Pilbara WA
Lifted curved steel tunnel arch segments and stood them upright from four lift points.
Terex MAC25 Franna, 4.5 t at 5 m
Power switchroom — Esperance, WA
Unloaded a prefabricated electrical switchroom from a truck and set it in place.
Demag AC300-6, 22.5 t at 10 m
Solar panel skid frames — Koondoola, Perth
Placed prefabricated solar panel frames on skids.
Terex AT40, 15 t at 3.5 m
Buildings, tanks and silos
Prison new units — Casuarina, WA
Erected precast wall panels for new accommodation blocks inside a secure perimeter.
Grove GMK5220 (220 t), Panels ~15.7 t
Water tank equipment — Halls Head, Mandurah
Lifted equipment modules onto the roof of a water tank.
Liebherr LTM1090-4.1, 0.9 t at 22 m radius
Dual silo lift — Broomehill Village, WA
Lifted two silos into position in Broomehill Village.
Dual crane lift — Midland TAFE, WA
A two-crane lift at Midland TAFE.
Jul 2024
About BTD
Certainty in HeavyLift
BTD makes BTD Draft: drafting software that works inside AutoCAD, with crane lifts as its first type of drafting. Based in Melbourne.
BTD Draft does the drafting the same way every time, from the decisions your people make. For a crane lift that’s the crane at its radius, plan and elevation, dimensions, the title block and the rigging sheet, from one form.
BTD Library keeps your cranes and rigging gear in one place, and every lift drafted is kept in the lift log.
For each crane model in your fleet, BTD builds the AutoCAD blocks from the manufacturer’s documents, so the crane on the sheet is drawn at the right boom, reach and slew.
BTD does not plan or approve lifts. Your planner chooses the set-up and checks the figures; your appointed person approves every lift.
